Blansko district
Water purification
Type of delivery: Drinking water technology
Location: Bořitov, Lysice, Drnovice, Žerůtky
Capacity: total of 500 m3 of drinking water storage
Commissioned: 10/2025
Commissioned: 10/2025
The “Vodovod Marek” project includes the construction and modernization of key water supply facilities to ensure stable and reliable drinking water delivery. The project provides new water storage tanks with a total volume of 500 m³ (VDJ Marek 2×150 m³, VDJ Bořitov 50 m³, VDJ Drnovice 150 m³), including fully equipped valve chambers, flow measurement, and chemical dosing systems. The Bořitov pumping station is designed to deliver water to VDJ Marek with a capacity of 7 l/s (2×3.5 l/s, H = 166 m), while the system allows an increased capacity of up to 10.5 l/s if required. The Školská pumping station operates in a 1+1 configuration with a capacity of 5.08 l/s and a head of 36 m. At the Hřbitov and Zámecká water sources, new pumps are installed with operating points of 12.35 m³/h (H = 93.31 m) and 13.22 m³/h (H = 73.54 m), respectively. The project comprehensively addresses water storage, pumping, and system control, with a strong focus on operational reliability and overall efficiency.